Skip to main content
Rayvn

Rayvn – From security incident to coordinated action

Connect situation awareness, roles, tasks, decisions and evidence for IT and OT incidents. The existing demo follows a fictional water-supply scenario.

Capability, tests and availability

Implemented foundation
Existing scenario engine, situation board and bounded OT context in the demo.
Documented test evidence
67 documented tests in eight files for lifecycle, roles, decisions and review.
Availability and production
Public exercise demo. It establishes no real incident, customer connection or OT device control.
  • Incident coordination
  • Water-supply scenario
  • Decision log

Practical example

A technical signal must become a coordinated case that operations, security and management can act on.

What should be checked?

The Rayvn demo combines observations, uncertainty, roles, actions and decisions in a fictional water-supply sequence. Situational awareness grants no OT control authority.

What should be recorded?
Understandable situation picture, ownership list and traceable incident log.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Situation picture

Connect confirmed facts, observations, unknowns and dependencies with freshness. Missing data does not mean normal operation.

  • Observed / confirmed / unresolved
  • Situation board

Practical example

Pressure deviation, unusual traffic and missing telemetry occur together. No single observation explains the situation.

What should be checked?

The board separates observed, confirmed and unresolved information. Show impact, coverage and investigation needs before concluding cause or response level.

What should be recorded?
Timestamped observations, source, impact and open questions.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Incident handling

Register observations and assess consequences. Correlation is not causation; an accountable incident leader directs action.

  • Incident lifecycle
  • Escalation
  • Normalization

Practical example

Assess an observation before turning it into an incident with response ownership and follow-up.

What should be checked?

Use existing stages from signal and assessment to response, normalization and review. Record escalation/de-escalation reasons and decision ownership.

What should be recorded?
Incident basis, prioritization, transition decisions and closure criteria.
  1. Observation
  2. Incident declared
  3. Situation picture
  4. Roles
  5. Actions
  6. Decisions
  7. Communication
  8. Normalization
  9. After-action review
Illustrative flow from the existing fictional water-supply scenario. Decisions remain human; Rayvn grants no OT process control.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

OT incidents

Bounded OT context shows zones, new peers and missing expected traffic. It grants neither PLC control nor automatic incident declaration.

  • OT context
  • Zone / asset
  • Water operations

Practical example

A network finding affects an operational zone, while impact on water delivery remains unknown.

What should be checked?

Bound context to facility, zone, possibly affected asset and observation quality. The OT owner assesses impact; Rayvn sends no PLC, HMI or SCADA commands.

What should be recorded?
Bounded context reference, operational review and documented uncertainty.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Roles and responsibility

Assign leadership, operations, IT/OT and communication responsibilities. Simulation roles grant no customer-system permissions.

  • Incident lead
  • IT / OT owner
  • Communications

Practical example

Technical staff investigates while someone must own operational decisions and communication.

What should be checked?

Assign incident lead, IT/OT owner, action owner and communication role. An exercise role is scenario responsibility, not production access or technical change authority.

What should be recorded?
Role, responsibility, deputy, mandate and escalation point.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Actions and tasks

Assign concrete tasks, owners and priorities. Confirm actual completion; all public-demo actions are simulated.

  • Action board
  • Owner
  • Deadline
  • Verification

Practical example

An action is marked complete without verifying resolution or new dependencies.

What should be checked?

Separate planned, in-progress, executed and verified work. Bind ownership and deadline to an outcome; retain blockers and follow-up after execution.

What should be recorded?
Action purpose, owner, status, deadline and evidenced outcome.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Timeline

Keep source, order and time for observations and decisions. Distinguish fresh local data from stale context.

  • Event time
  • Registration time
  • Chronology

Practical example

An observation is recorded late. Registration time must not replace event time.

What should be checked?

Retain event time, registration, source and corrections. Temporal correlation may justify investigation, but does not prove causation.

What should be recorded?
Chronology with sources, assessments and traceable corrections.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Decision log

Record known facts, considered alternatives and review dates. Uncertainty must follow escalation.

  • Decision basis
  • Alternatives
  • Reassessment

Practical example

An incident lead decides with incomplete information. Later review must use what was known then.

What should be checked?

Record decision owner, known facts, uncertainty and alternatives. Set a review trigger and distinguish drafts from approved decisions.

What should be recorded?
Rationale, approval, alternatives and next decision point.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Communication

Prepare audience-specific drafts. Humans approve recipients and content; the public demo sends no real messages.

  • Audience
  • Draft
  • Human approval

Practical example

Operations, management and external audiences need different detail but a consistent situation picture.

What should be checked?

Prepare an audience-specific draft with confirmed facts and uncertainty. A responsible person approves content and recipients; the demo sends no real messages or official notifications.

What should be recorded?
Audience, approved text, owner and actual sending status where available.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Incident evidence

Connect timeline, decisions, actions and evidence. Separate observed, confirmed and unknown; do not centralize raw customer events.

  • After-action review
  • Evidence
  • Report

Practical example

After an incident, management needs a clear report while specialists need traceable observations and decisions.

What should be checked?

Combine chronology, impact, actions, decisions and lessons. Preserve executed/verified distinctions and unresolved items without exporting raw customer events to a new cloud service.

What should be recorded?
After-action report, lessons, ownership and improvement verification.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Exercises and scenarios

The existing fictional water scenario supports practice in roles, decisions and recovery. It is not a real attack report.

  • Water-supply simulation
  • Nine stages
  • Reset

Practical example

Exercise participants should handle uncertainty and ownership, not merely click through a successful ending.

What should be checked?

Use the existing nine-stage water-supply scenario. Compare observations, actions and normalization; discuss real-facility evidence needed before each transition.

What should be recorded?
Exercise goals, assumptions, observer notes and improvements.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

Technical architecture

PR650–PR670 cover the shell, lifecycle, situation picture and bounded OT context. Repository simulations are not production integration proof.

  • PR650–PR670
  • Vitest
  • Synthetic fixtures

Practical example

Test roles, state transitions and bounded OT context without implying a real customer incident.

What should be checked?

The historical receipt records 67 tests in eight files covering shell, lifecycle, situation, roles, decisions, review and OT awareness. It is not a production exercise or live water-facility integration.

What should be recorded?
Test files, scenario scope, documented transitions and explicit absence of OT control.
Explore this in the product demo
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts

67/67 · 2026-11-19

Try the demonstration

Synthetic demonstration. No customer connection, production control or real messages. Pilots and integrations require separate validation.

  • Existing Rayvn engine
  • Water-supply scenario

Practical example

Try an incident sequence with uncertain signals, coordinated actions and recorded normalization.

What should be checked?

The embedded walkthrough reuses the original scenario component. The full demo remains at its existing address, without customer connectivity or real messages.

What should be recorded?
Restartable synthetic incident sequence for review and discussion.
View sources and limitations

Examples are professional review suggestions, not customer incident reports or proof that every check ran. The lab receipt shows the actual test scope.

  • RayvnWaterIncidentScenario.tsx
  • rayvnSituationBoard.pr652.test.ts
  • rayvnDecisionCommunication.pr655.test.ts
  • rayvnNormalizationAfterAction.pr656.test.ts
  • rayvnOtSituationalAwareness.pr670.test.ts
Open the existing Rayvn demo (Norwegian)

Further reading

Articles in Norwegian.

Book a demonstration